Operator's Manual
Figure80
AdjustingtheMotionControl
Linkage
Locatedoneithersideofthefueltank,belowtheseatare
thepumpcontrollinkages.Rotatingthepumplinkage
witha1/2inchwrenchallowsnetuningadjustments
sothatthemachinedoesnotmoveinneutral.Any
adjustmentsshouldbemadeforneutralpositioningonly.
WARNING
Enginemustberunninganddrivewheelsmust
beturningsomotioncontroladjustmentcanbe
performed.Contactwithmovingpartsorhot
surfacesmaycausepersonalinjury.
Keepngers,hands,andclothingclearofrotating
componentsandhotsurfaces.
1.Priortostartingtheengine,pushthedeckliftpedal
andremovetheheightofcutpin.Lowerdeckto
theground.
2.Raisetherearofmachineupandsupportwithjack
stands(orequivalentsupport)justhighenoughto
allowdrivewheelstoturnfreely.
3.Removetheelectricalconnectionfromtheseat
safetyswitch,locatedunderthebottomcushionof
theseat.Theswitchisapartoftheseatassembly.
4.Temporarilyinstallajumperwireacrossthe
terminalsintheconnectorofthemainwiring
harness.
5.Startengine.Brakemustbeengagedandmotion
controlleversouttostartengine.Operatordoes
nothavetobeintheseatbecauseofthejumper
wirebeingused.Runengineatfullthrottleand
releasebrake.
6.Runtheunitatleast5minuteswiththedrivelevers
atfullforwardspeedtobringhydraulicoilupto
operatingtemperature.
Note:Themotioncontrolleverneedstobein
neutralwhilemakinganynecessaryadjustments.
7.Bringthemotioncontrolleversintotheneutral
position.Adjustpumpcontrolrodlengthsby
rotatingthedoublenutsontherodintheappropriate
directionuntilthewheelsslightlycreepinreverse
(
Figure81).Movethemotioncontrolleverstothe
reversepositionandwhileapplyingslightpressureto
theleverallowthereverseindicatorspringstobring
theleversbacktoneutral.Thewheelsmuststop
turningorslightlycreepinreverse.
Figure81
1.Doublenuts
8.Shutoffunit.Removejumperwirefromwire
harnessandplugconnectorintoseatswitch.
9.Removethejackstands.
10.Raisethedeckandre-installtheheightofcutpin.
11.Checkthatthemachinedoesnotcreepinneutral
withtheparkbrakesdisengaged.
51