Service Manual
ENGINE
4-6
Toro TITAN 2009-2013 Service Manual
4
Fig. 055 PICT-2056
4. Install the fuel and vent lines to the engine.
5. Install the throttle and choke cables to carburetor
linkage.
6. Apply Loctite
®
242 to the (4) engine mounting bolts.
7. By hand, install the (4) engine mounting bolts.
Note: Some of the engine mounting bolts also
secure the clutch stop bracket and stiffener
tube to the frame. See the exploded views for
application and mounting location.
8. In a cross pattern, torque the (4) engine mounting
bolts to specication - 33 ft-lbs. (44 Nm).
9. Install mufer and new mufer gaskets, if necessary,
to the engine and torque mufer fasteners to
specication - 13 ft-lbs. (17.5 Nm).
10. Install heat shield to the mufer mounting screws
and torque to specication - 5 ft-lbs. (7 Nm).
11. Install the heat shield and mufer to frame mounting
screws and torque to specication - 17 ft-lbs. (23
Nm).
12. Apply anti-seize to the engine crankshaft and the
ends of the drive pulley shaft.
13. Install the drive pulley onto the crankshaft and hold
in position.
Note: The drive pulley is marked “CLUTCH SIDE”
for proper installation (Fig. 056).
Engine Installation
1. Position the engine onto the frame.
2. Connect the battery ground wires (E) to the engine
block, and connect the positive battery wire (F) to
the engine starter motor.
3. Connect the chassis to engine harness connector
(D) (Fig. 055).
D
F
E
Fig. 056 PICT-2044
14. Install the drive belt around the drive pulley.
15. Install the drive belt tensioner spring as oriented
below (Fig. 057).
Fig. 057 PICT-2041