Service Manual

TORO®- Grandstand Service Instruction Manual 3-5
CHASIS
3
Height of Cut Assembly Removal
(Figure 7)
1. Remove the fuel tank, see “Fuel Tank Removal,”
page 3-10.
2. Lower deck to lowest position.
3. Remove the deck, see “Deck Removal,” page 7-3..
4. Remove the deck lift assembly.
5. Remove height of cut link from right rear lift arm by
removing bolt and nut.
6. Remove height of cut link from height of cut
assembly by removing bolt and nut.
7. Remove retaining ring from height of cut lever
assembly.
8. Remove nuts holding height of cut assembly from
inside of tower.
9. Remove height of cut assembly.
NOTE: Flanged bushing can remain in tower and
still usable.
Height of Cut Assembly Installation
(Figure 7)
1. Place 3 bolts through the height of cut plate and
decal assembly (outer plate). Place face down with
bolts pointing up.
2. Place the short spacer on the top right bolt, long
spacer on bottom right bolt, and short spacer on left
bolt.
3. Place height of cut lever and flat washer on height
of cut plate and decal assembly.
4. Place height of cut plate (inner) on bolts and height
of cut lever (place 2 cable ties in the height of cut
holes to keep assembly together).
5. Place spacer on top right bolt and left bolt.
6. Place flanged bushing into hole on tower.
7. Place bolt through bottom hole of height of cut lever
assembly.
8. Line up bolts and height of cut lever with holes
in tower, tighten nuts and place retaining ring.
Remove the cable ties.
9. Attach height of cut link and tighten bolt. Tighten to
67 +/- 10 ft. lbs.
10. Attach deck lift assembly.
11. Attach the deck.
12. Install the fuel tank.
13. Level the deck.