Service Manual
6-25
Digital Edition - TITAN® HD Service Manual
January 2018
Table of Contents
ENGINE
Engine
Kawasaki Engine
Installation (Cont.)
19. Connect the chassis wire harness to the main engine wire harness (Figure 36).
20. Connect the fuel supply line to the fuel lter.
21. Install the engine guard.
22. Open the fuel supply valve.
23. Fill crankcase with approved oil and verify proper oil level.
24. Connect the battery terminals.
25. Verify proper function of the unit.
NOTE: Verify engine RPM is set to 3750 ± 50 RPM.
Figure 36