Setup Instructions
Table Of Contents
- .
- 1 Removing the Machine from the Crate
- 2 Adding Fuel to the Machine
- 3 Checking the Engine-Oil Level
- 4 Servicing the Hydraulic Oil
- 5 Checking the Tire Pressure
- 6 Servicing the Battery
- 7 Raising the Rollover Protection System (ROPS)
- 8 Checking the Grass Deflector
- 9 Checking the Machine for Grease
- 10 Installing the Right Bumper
- 11 Checking the Mower Adjustment
- 12 Checking the Machine Before Delivery to the Customer (All Machines)
- 13 Delivering the Machine to the Customer (All Machines)
9
CheckingtheMachinefor
Grease
Partsneededforthisprocedure:
1tube
No.2lithiumormolybdenum-basedgrease(purchase
separately)
Procedure
Beforeyouusethemachine,checkthemachineforgrease;
refertoLubricationintheOperator'sManual.
10
InstallingtheRightBumper
Partsneededforthisprocedure:
3
Locknut(3/8inch)
3
Carriagebolt(3/8x2-1/4inches)
Procedure
Mountthesidebumpersinthetopholeswhenoperatingin
heightofcuthigherthan64mm(2-1/2inches)andinthe
centerholeswhenoperatinginheightofcutlowerthan64
mm(2-1/2inches).
1.Raisethemowerdecktothe12.7cm(5inch)height
position(alsothetransportposition).
2.Therightbumperisziptiedtothemachinefor
shipping.Removeanddiscardtheplasticzipties.
Figure5
1.Carriagebolt
2.Bumper(center-holemountingshown)
3.Locknut
3.Moveeachbumpertothedesiredpositionandsecure
itwith3carriagebolts(3/8x2-1/4inches)and3
locknuts(3/8inch).
4.Torquetheboltsto14to16N∙m(10to12ft-lb).
5