Service Manual

5-11Z Master Z400 Service Manual
5
Fig 246 PICT-0032c
Fig 245 PICT-0031c
b. With the choke knob in the full down position
(Fig. 245) and the choke linkage in the full open
position (left), tighten the cable clamp (Fig. 246).
ENGINE
18. Reconnect the throttle cable:
a. Reconnect the z-bend of the throttle cable to the
throttle linkage (Fig. 247).
Fig 247 PICT-0034c
b. Position the throttle control lever so that there is
approximately1/2”(12.7mm)betweenthelever
and the full throttle position of the throttle slot
(Fig. 248).
Fig 248 PICT-0035c