Service Manual
7-4 Z Master Z400 Service Manual
7
MOWER DECKS/PTO
Estate Series
1. Slide the deck under the unit.
2. Place 4 x 4 wood blocks under the edge of the
mower deck.
3. Position the lift handle to the lowest position and pin
in place (Fig. 416).
Mower Deck Installation
5. Install the cross brace to the deck using the
hardware as shown (Fig. 417).
Fig 416 PICT-0138
4. Inspect the cross brace bushings for wear. Replace
as needed.
Fig 418 PICT-0126
6. Attach the front and rear lift chains to the mower
deck (Fig. 418).
Fig 417 PICT-0143
A. Bolt C. Washer (2)
B. Bushing D. Nut
A
B
C
D