Service Manual

ENGINE
4-7TimeCutter® Z/Precision® Z Service Manual
4
9. Install the 4 engine mounting bolts through the
hydro-supports of the frame and into the engine (Fig.
245). Torque the engine bolts to 400 – 500 in-lbs.
(33.3 – 41.6 Nm) (Fig. 246).
10. Install the 2 screws retaining the heat shield to the
PXIÀHU)LJ
 ,QVWDOOWKHIXHOOLQHRQWRWKHIXHO¿OWHUDQGLQVWDOOWKH
hose clamp (Fig. 244).
Fig. 244 PICT-9515
Fig. 245 PICT-9514
Fig. 246 PICT-9537
Fig. 247 PICT-9510a