Setup Instructions
Figure 27
3. Chec k the tensioning ar m for g rease
( Figure 28 ).
4. Chec k the g rease for the three spindle bearings
( Figure 28 ). If needed, add g rease until it
comes out of the lo w er seals .
Figure 28
5. Install the belt co v ers .
Step
11
Checking the Side Discharge
Chute
No Parts Required
Procedure
If there are plastic ties holding the side disc harg e
c hute up , remo v e them and lo w er the c hute into
place .
An unco v er ed discharge opening could
allo w the la wn mo w er to thr o w objects in the
operator’ s or bystander’ s dir ection and r esult
in serious injur y or death. Also, contact with
the blade could occur .
Nev er operate the la wn mo w er with the
g rass deflector r emo v ed unless y ou install a
co v er plate, a mulch plate, or a g rass chute
and catcher .
1. Mak e sure the L end of spring is installed
behind the dec k edg e before installing the bolt
as sho wn in Figure 29 .
2. Place the J hook end of spring around g rass
deflector ( Figure 29 ).
Important: T he g rass deflector must be
fr ee to r otate with do wnw ard tension. Lift
the deflector up to the full open position
and ensur e that it r otates fr eel y ,without
binding into the full do wn position.
10