Service Manual

ELECTRICAL
6-20 Z580/Z593/Z595 Diesel Service Manual
6
Pull Coil Terminal Test Hold Coil Terminal Test
This test checks both the pulling coil and pulling coil
timer module (Fig. 684).
1. Disconnect the 3 terminal connector from the engine
stop solenoid wiring harness.
2. Remove the engine stop solenoid from the engine.
3. Connect a jumper lead from the pull coil (G) terminal
to the positive battery terminal.
4. Connect a jumper lead from the ground (A) terminal
to the negative battery terminal.
The plunger should retract into the solenoid body. With
the jumpers still connected to the battery terminals,
the plunger should extend out of the solenoid body
in approximately 1.2 seconds. If the plunger does not
retract and then extend, it is faulty.
Fig 684 3EEACAB1P007A
This test checks the holding coil.
1. Connect a jumper lead from the ground (A) terminal
to the negative battery terminal.
2. Connect a jumper lead from the holding (B) terminal
to the positive battery terminal.
3. Connect a jumper lead from the pull coil (G) terminal
to the battery positive terminal.
The plunger should pull into the solenoid body. Remove
the pull coil terminal (G) from the positive battery term-
inal. The plunger should remain pulled into the solenoid
body. If the plunger does not remain pulled into the
solenoid body, the engine stop solenoid is faulty.
A. Ground E. Battery Positive
B. Holding Coil Terminal F. Battery Negative
C. Switch for Pulling Coil G. Pulling Coil Terminal
D. Switch for Holding Coil
A
E
B
F
C
G
G
D