Service Manual

5-40 Z Master 500 Gas Series Service Manual
5
Fig 308 DSC-2800
33. Install the rear bumper guard (Fig. 308).
Fig 307 DSC-2802
32. Install the engine hood assembly with 2 clevis pins,
washers, and hair pins (Fig. 307).
34. Install the battery and connect the positive and then
the negative battery cable.
35. Test operate engine; adjust choke and throttle cables
as required. Check engine low and high idle are to
specication. Add coolant as needed; check system
for leaks.
ENGINE
Fig 306 DSC-2803
31. Install the engine shield with 4 bolts, washers, and
nuts and tighten (Fig. 306).
Fig 305 DSC-2804
30. Install the air deector (Fig. 305).