Service Manual

FIG.
22.
Assembling Output Shaft
FIG.
23.
Output Shaft Assembly Order
Place the output shaft assembly into the lower case
half.
Check
the end play
of
the output shaft by in-
serting
a
feeler gauge between
the
shim washer and
"E"
ring. Correct end play
is
0-.012
in.
(0-.3
mm).
Shim washers can
be
used in any combination to
achieve proper end play.
\
FIG.
24.
Checking Output Shaft End Play
Remove
the
input and
the
output shafts from
the
lower case half.
Fill
the lower case half with
12
oz.
(350
gm)
of
grease. Replace
the
chain on the two
reverse sprockets and reinstall
the
shafts.
FIG.
25.
Install Shafts into Case Half
The
four shoulder bushings have triangular shaped
feet that must seat in the notches provided for them
(Fig.
26).
FIG.
26.
Align Shoulder Bushings
Check
the
gears for proper alignment.
SHIFT
FORKS
Each shift fork has three small holes in line with
each other. Install the shift forks
so
the three small
holes are on
the
same
side
of the case
as
the
shift
..
lever bracket.
Install
the
lockout bracket
so
the
two
"T"
shaped
slots are over
the
raised tabs on
the
shift
forks.
Re-
install the four Phillips head shoulder screws (Fig.
27).
Coat the shift forks and lockout plate with grease.
-6-