Multi Pro 5800Page 8 86GeoLink Spray System
Flow Meter
1
2
3
4
4
5
5
6
7
8
9
10
1. Flow meter
2. Agitation valve assembly
3. Nozzle valve assembly
4. Clamp (2)
5. Gasket (2)
6. Elbow assembly
7. Flange nut
8. Flange head screw
9. Clamp
10. Gasket
Figure
103
FRONT
RIGHT
NOTE ARROW DIRECTION
The flow meter (item 3) provides an input to the ASC10
Controller regarding the spray system flow that is avail-
able to the nozzle valves. If the flow meter is being re-
placed, calibrate the flow meter after installation (see
Flow Meter Calibration in this chapter).
IMPORTANT: Make sure to remove and neutralize
chemicals from spray components before disas-
sembly. Wear protective clothing, chemical resist-
ant gloves and eye protection during repair.
Removal (Fig. 103)
1. Park machine on a level surface, stop spray pump,
stop engine and engage parking brake. Remove key
from ignition switch.
2. Disconnect wire harness connector from flow meter.
IMPORTANT: Note the direction of the arrow on top
of flow meter. The arrow should point toward the el-
bow assembly.
3. Remove the flange head screw (item 8) and flange
nut securing the Rclamp to the valve mount.
4. Remove elbow assembly (item 6) and discard gas-
kets.
5. Remove flow meter and discard gaskets. See Flow
Meter Service in this chapter for additional information.
Installation (Fig. 103)
NOTE: Replace, do not reuse gaskets and Orings.
Coat Orings and gaskets with vegetable oil or silicone
grease before installation to reduce damage during as-
sembly.
1. Make sure that arrow on flow meter body is pointing
toward elbow assembly (item 6) and secure the flow me-
ter to the agitation valve assembly.
2. Install the elbow assembly.
3. Connect wire harness connector to flow meter.
4. Operate spray system and check for leaks. Repair all
leaks before returning the sprayer to service.