Installation Instructions

7
20.Apply thread sealer and install a 1 x 3/4 Hose
Barb in the end of both Ball Valves.
21.Apply thread sealer and install 1 x 90° Barbed
Elbow in the top port of the Cross.
22.Apply thread sealer and install a 1 x 3/4 Hose
Barb in the bottom port of the Cross.
23.Mount Cross Base to Boom Frame using (1)
5/16 x 3/4 carriage bolt and flange nut. See FIG.
16.
IMPORTANT! DO NOT overtighten U-Bolts in
step 24. The clamping action could crush the
Cross.
24.Mount Cross Assembly to Cross Base, as
shown in FIG. 16, using (2) 5/16 U-Bolts and (4)
flange nuts. See page 4 FIG. 8.
25.Attach other end of the 1 x 44 Hose attached
to Ratchet Valve earlier to the 90° Hose Barb in
top of Cross. Secure with (1) 1 hose clamp.
NOTE: When cutting the hoses for the
Extension Booms be sure to leave enough
hose length to cross Booms.
14.Secure the two plates of the Boom Support
Assembly to the Extension Boom Pipe, using two
(2) 1/4" U-bolts, (4) lock nuts and flat washers.
See FIG. 15.
15.Assemble the RH Boom Support Assembly
to the other Extension Boom Pipe.
16.Adjust the Booms to a level position by
adjusting the jam nuts on the adjustable clevis
assemblies (See FIG. 13) to the desired position,
then tighten the end nuts against the Main Frame
plate.
17.Attach three Double Barb Turret Bodies and
one Single Barb Turret Body with Clamp
Assemblies on each Extension Boom Pipe as
shown in FIG. 15.
18.Level Nozzles and space 20" apart. Connect
the Turret Body Assemblies with 3/4" x 19" Jumper
Hoses and a 3/4" x 21" Jumper Hose. Secure
with hose clamps. See FIG. 15.
19.Apply thread sealer and install (2) 1 Ball Valves
into opposing ports of 1 Cross using (2) 1 Close
Nipples. See FIG 16.
FIG. 16
1. 1 Ball Valve 3. Cross Base
2. 1 Cross
2
1
3
1
1221
FIG 15
1. Boom Support Ass'y 5. Single Barb Turret
2. Extension Boom Pipe 6. Jumper Hose 3/4 x 19"
3. U-bolt 7. Boom Cap
4. Double Barb Turret 8. Jumper Hose 3/4 x 21"