Service Manual

Groundsmaster 360Operator Cab Page 8.1 − 18
(Rev. A)
2. Make sure that condensation hoses are secured to
the drain fittings on the bottom of mixing box assembly.
Also, route hoses to cab frame for proper draining of
condensate.
3. Make sure to connect electrical connectors from mix-
ing box wire harness and binary switch on A/C drier−re-
ceiver.
4. If any A/C system components were removed from
cab headliner, make sure that all machine air condition-
ing components are installed and secure. Then, have a
certified air conditioning service technician evacuate the
air conditioning system completely, properly recharge
the system with R134a refrigerant and then leak test the
system. A/C system capacity is 3.44 pounds of R134a
refrigerant.
5. Secure cover to mixing box assembly:
A. Position mixing box cover to mixing box. Make
sure that wire harness is routed through recess in
side of mixing box.
B. With the rivet pin in a raised position, insert rivets
through cover and into hole in mixing box. Press pin
into rivet to secure rivet in place.
6. Operate the heater system to make sure that no
coolant leaks in cab headliner exist.
7. When all service in cab headliner is completed, se-
cure roof panel to top of cab (see Roof Assembly in this
section).