Operator's Manual
4.Startwiththeuppercorneroftheupholstery
panelandadhereittothebackofthecabso
thatitiscenteredonceitiscompletelyinstalled.
5.Adherethepanel,1sectionatatime,fromone
endtotheother,untiltheupholsterypanelis
completelyapplied.
InstallingtheInsulationBlanket
1.Removetheinsulationblanketfromtheshipping
tube.
Note:Donotunrolltheinsulationblanketuntilit
isinposition.
2.Positiontheblanketacrossthestorage
compartmentsbehindtheoperator’sseat.
3.Tuckintheedgesoftheblanketaroundthe
operator’sseatasyouunrollittowardthefront
ofthemachine.
4.Removethebackingfromtheadhesiveonthe
hookandloopstripsattheendoftheblanket
andadherethestripswheretheylie.
Note:Ensurethesurfacewheretheadhesive
backedhookandloopstripadherestothe
platformisclean.
5.Adherethehookandloopstripsrmlytothe
platform.
InstallingtheFloorTread
1.Ensurethattheinstallationareaisclean.
2.Installtheoortreadontotheplatforminside
thecab.
g030849
Figure33
1.Floortread
3.Ensurethattheboltheadsontheplatformare
alignedwiththecutoutsintheoortread.
7
ConnectingtheHoses
Partsneededforthisprocedure:
2
Fitting(3/8NPTx0.625barb)
2Hoseclamp
1
Right-angletting(3/4inch)
1
Right-angletting(7/8inch)
2
R-Clamp
ConnectingtheHeaterHoses
1.Applysealanttothetting(3/8NPTx0.625
barb);skippingtherstthread.
2.Removetheheatersupplyandreturnhose
plugsfromtheengineandinstallthettings(3/8
NPTx0.625barb)asshowninFigure34.
g303473
Figure34
1.Fitting(3/8NPTx0.625
barb)
3.Fitting(3/8NPTx0.625
barb)
2.Returnhoseplug
4.Supplyhoseplug
3.Tightenthettings(3/8NPTx0.625barb)2to3
turnspastnger-tight.
4.Routethehosesfortheheaterandthedrain
hosethroughthehoseringontherearcab
mount(Figure35).
14