Operator's Manual
4.Whilesupportingthechamber,removethe
spacer(Figure17).
5.Movethechambertothedesiredheight-of-cut
andinstallaspacerintothedesignated
height-of-cutholeandslot(Figure18).
g026184
Figure18
6.Positionthetappedplateinlinewiththespacer.
7.Installtheboltngertight.
8.Repeatsteps4-7foreachsideadjustment.
9.Tightenallthreeboltsto41N-m(30ft-lb).
Alwaystightenthefrontboltrst.
Note:Adjustmentsofmorethan3.8cm(1-1/2
inches)mayrequiretemporaryassemblyto
anintermediateheighttopreventbinding(e.g.
changingfrom3.1to7cm(1.25to2.75inch)
height-of-cut).
9
AdjustingtheRoller
Scraper(Optional)
NoPartsRequired
Procedure
Theoptionalrearrollerscraperisdesignedtowork
bestwhenthereisanevengapof0.5to1mm
(0.020–0.040inch)betweenthescraperandroller.
1.Loosenthegreasettingandthemounting
screw(Figure19).
g011346
Figure19
1.Rollerscraper
3.Greasetting
2.Mountingscrew
2.Slidethescraperupordownuntilagapof0.5to
1mm(0.020to0.040inch)isachievedbetween
therodandtheroller.
3.Securethegreasettingandscrewto41N-m
(30ft-lb)inanalternatingsequence.
10
InstallingtheMulching
Bafe(Optional)
NoPartsRequired
Procedure
1.Thoroughlycleandebrisfromthemounting
holesontherearwallandleftsidewallofthe
chamber.
2.Installthemulchingbafeintherearopening
andsecureitwith5angeheadbolts(Figure
20).
g011347
Figure20
1.Mulchingbafe
23