Service Manual

LINKAGE
4-52 Fixed Deck Mid-Size Service Manual
4
Fig 299 PICT-5556
1. Slide the spring tab end of the operator presence
control (OPC) rod through the left side opening of
the control panel. Install the right end of the rod into
the opening on the right side handle bar. Slide the
rod through the right side handle bar opening until
the left end of the rod can be inserted through the
left handle bar opening (Fig. 299).
Fig 298 PICT-5556
6. Remove the OPC rod by sliding it to the far right,
dropping the left side of the rod, and then remove
the rod through the left side opening of the control
panel (Fig. 298).
Installation
Fig 300 PICT-5554
2. Install the extension spring onto the OPC rod and
the underside of the control panel (Fig. 300).
Fig 297 PICT-5554
4. Repeat steps 1 thru 3 to remove the right side OPC
lever.
5. Remove the extension spring located under the
control panel (Fig. 297).