Service Manual
ENGINE
3-18 Fixed Deck Mid-Size Service Manual
3
Mid-Size Fixed Deck Engine
Installation (Hydro)
1. Position the engine onto the chassis.
2. Apply thread locking compound to the threads of all
4 engine mounting bolts.
3. Install the 4 engine mounting bolts, nuts and wash-
ers that secure the engine to the chassis. Torque the
4 engine mounting bolts to 15-20 ft-lbs. (20-27Nm).
4. Pull on the split ring and chain assembly to reduce
tension on the idler assembly. While pulling on the
split ring/chain assembly, route the traction control
belt around the pulleys (Fig. 068).
Fig 068 PICT-4747
Fig 069 PICT-4766
5. Release the split ring/chain assembly. If necessary,
adjust the traction control belt guide so that the
distance between the belt guide and belt is 1/8”
(.31cm) (Fig. 069).
Fig 067 PICT-6828
22. Loosen and remove the 4 nuts, bolts and washers
that secure the engine to the chassis and then
remove the engine (Fig. 067).