Service Manual

CuttingDeckLinkService
(100 to 140 in--lb)
12 to 15 N·m
g305070
Figure333
1.Link
5.Flatwasher(2used)
2.Bushing(2used)
6.Retainingring
3.T aperedstud7.Flangenut
4.Sphericalbearing
8.Dustcap
(1.625 in)
41.3 mm
g305071
Figure334
1.Rearlink3.Hexjamnut
2.Capscrew
Disassembly(Figure333)
1.Pressbushingsfromtopoflink.
2.Removedustcapandretainingringfromlink.
3.Presstaperedstudwithsphericalbearing,atwashersandangenutfrom
link.
4.Removeangenutandpresssphericalbearingfromtaperedstud.
Assembly(Figure333)
1.Installnewsphericalbearingontotaperedstud.Securebearingwithange
nut.Torquenutfrom12to15N·m(100to140in-lb).
2.Positionatwasherinbothsidesofsphericalbearing.
3.Presstaperedstudwithsphericalbearing,atwashersandangenutinto
link.Securesphericalbearingintolinkwithretainingring.
4.Pressbushingsintotopboreoflink.
Groundsmaster
®
4100-D&4110-D
Page9–11
CuttingDecks:ServiceandRepairs
13203SLRevF