Service Manual

Installation(Figure94andFigure95)(continued)
8.Fillpistonpumphousingthroughcasedrain(90ºbarbedtting)withnew
hydraulicoil(Figure97).Thiswillensurethatinternalpumpcomponents
haveadequatelubricationduringinitialoperation.
9.Lowermachinetoground.
10.Replacehydraulicltersandllhydraulicreservoirwithnewhydraulicoil.
11.Primehydraulicpumps(seePrimingHydraulicPumps(page5–86)).
12.Properlyllhydraulicsystem(seeChargeHydraulicSystem(page5–91)).
13.Stopengineandcheckforhydraulicoilleaks.Checkhydraulicreservoir
oillevel.
Groundsmaster
®
4000-D&4010-D
Page5–101
HydraulicSystem:ServiceandRepairs
13202SLRevF