Installation Instructions
4
11. Insert the spacer into the hose clamp. Attach the hose
clamp to the hose bracket with two 1/4–20 x 2–1/2” lg.
screws and nuts. Remove the bolts and locknuts from
the left front motor mount, near the left side of the
carrier frame and discard the locknuts. Install the hose
bracket and hose clamp with the previously removed
bolts and two new locknuts (Fig. 12).
Note: Hose 100–3913 routes through the hose clamp
(Fig. 12).
1
2
3
Figure 12
1. Hose bracket
2. Hose clamp
3. Spacer
12. Mount the control block to the block bracket with two
5/16–18 x 5/8” lg. screws and washers (Fig. 8).
13. Install the remaining hoses, positioning as shown in
figure 13. Use figures 14 –17 for reference during
installation.
Note: Route hoses 106–0197, 106–0190 & 100–3919
above the wing deck carrier frame, on top of existing long
hydraulic tubes and next to main wire harness.
Note: Hoses 106–0197 & 106–0198 are connected to the
control block and front bulkhead fittings. Remove caps
from fittings.
Note: Hose 76–9570 connects to existing Tee fitting
located at R.H. bulkhead for the right, deck motor hydraulic
hoses.
Note: Hose 100–3915 connects to existing Tee fitting
located at L.H. bulkhead connections for the left, deck
motor hydraulic hoses
Note: Hose 100–3919 connects to existing Tee fitting
located on the underside of the hydrostat.
14. Secure all new hoses with cable ties. Make sure hoses
do not contact any hot or moving parts.
Note: Route hose 100–3914 under oil pan allowing a 4”
gap between oil pan and hose.
4
4
5
5
6
7
8
10
11
2
3
3
2
112
8
9
13
Figure 13
1. Front Bulkhead
2. Part No. 106–0197
3. Part No. 106–0198
4. Part No 100–3912
5. Part No 100–3910
6. Part No 100–3911
7. Part No 100–3914
8. Part No 100–3913
9. Part No. 100–3919
10. Part No 100–3915
11. Part No 76–9570
12. L.H. Bulkhead
13. R.H. Bulkhead