Operator's Manual
49
4. Remove negative (–) battery cable connectors from
batteries (Fig. 56). Connect a 3 to 4 amp. battery
charger to the posts. Charge the batteries at a rate of 3 to
4 Amperes for 4 to 8 hours.
Charging the battery produces gasses that can
explode.
Never smoke near the battery and keep sparks and
flames away from the battery.
Warning
5. When batteries are fully charged, disconnect charger
from electrical outlet and battery posts.
6. Connect negative (–) cable ends, slide tray back in
place, and secure with capscrews. Install side panel,
close hood and secure both with latches.
Fuses and Circuit Breaker
One 5 amp., two 15 amp. fuses, and a fusible link are
incorporated for the protection of the entire wiring circuit.
The link can be replaced if total loss of electrical function
results. They are located under the control panel to the right
of the seat (Fig. 57). If total loss of electrical function
occurs, find and correct the malfunction before replacing
the fusible link.
1
Figure 57
1. Fuse block
Important Do not install fuses in fuse block on left side
of instrument control panel. Fuses should be installed in
this fuse block only if machine is equipped with a road
light kit.
Servicing the Brake System
Check brake fluid level every 50 hours operation. Replace
fluid every 1000 hours operation, or yearly. Replenish
system with DOT 3 hydraulic brake fluid. To check fluid
level:
1. Raise floor panel in front of seat (Fig. 58). Remove tool
tray.
2
1
Figure 58
1. Floor plate 2. Tool tray
2. Snap cover bail off cover and remove cover from
master cylinder (Fig. 59).
3
2
1
Figure 59
1. Master cylinder
2. Cover bail
3. Reservoir cover