Service Manual

LINKAGE
4-110 Floating Deck Mid-Size Service Manual
4
8. Remove the choke handle, cable and gasket as-
sembly out through the control panel (Fig. 0720).
Fig 0720 PICT-0636a
Choke Cable Installation
9. Remove the gasket from the handle assembly (Fig.
0721).
2. Slide the choke cable through the opening on the
control panel (Fig. 0723).
Fig 0721 PICT-0637a
Fig 0723 PICT-0636a
1. Slide the gasket onto the choke handle assembly
(Fig. 0722).
Fig 0722 PICT-0638a