Service Manual
CHASSIS
3-52 Floating Deck Mid-Size Service Manual
3
If the space is not correct, adjustment is needed:
7. Loosen the 6 carrier frame mounting bolts (3 on the
left, 3 on the right) (Fig. 0198).
Fig 0198 PICT-1303
5. Hold a ridid straight edge (36” minimum length) on
top of the 2”x2” piece of tubing stock so it reaches
out to the front cross brace of the carrier frame (Fig.
0196).
Fig 0196 PICT-1341
6. The space between the front cross brace and the
straight edge should be 11/16” + 1/4” (17.46mm +
6.35mm) (Fig. 0197).
4. Place a 2”x2” by 8” (aprox.) long piece of tubing
stock on the engine deck along the right side the
engine (Fig. 0195).
Fig 0197 PICT-1345 Fig 0195 PICT-1339