Service Manual
Groundsmaster 4100--D/4110--DCutting Deck
Page 8 -- 8
NOTE: Installationof clevispins todeck andheight--of--
cut chains is easier if deck is lifted slightly.
4. Install clevis pins and hairpins that secure the
height--of--cut c hains to the rear of the cutting deck (Fig.
2).
5. Remove plugs from hydraulic hoses and fittings on
wing deck lift cylinders. Using labels placed during re-
moval, correctly attach hydraulic hoses to lift cylinders.
6. Connect cutting deck wire harness to main machine
wire harness (Fig. 5).
7. Position dampers to lift arms. Install clevis pins and
hairpins to secure dampers to lift arms (Fig. 3).
8. Install all removed cutting deck covers.
9. Install hydraulic motors to cutting deck (see Cutting
Deck Motor Installation in the Service and Repairs Sec-
tion of Chapter 4 -- Hydraulic System).
10.Lubricate grease fittings on cutting deck and lift as-
semblies.
11.Fill reservoir with hydraulic fluid as required.
1. Cutting deck wire harness connection
Figure 5
1