Operator's Manual

Installation
5
Installing the Carrier Frame to
the Traction Unit
1. Align the carrier frame holes with the mounting
holes in the traction unit frame (Fig. 3).
2. Fasten each side of the carrier frame to the
traction unit with three (3) 1/2”-13 x 1” (25 mm)
flange screws and locknuts. Torque the mounting
screws to 60–80 ft-lb (81–109 Nm) (Fig. 3).
4
3

1
2
Figure 3
1. Carrier Frame
2. Traction Unit Frame
3. 1/2”-13 x 1” (25 mm)
Flange Screw (3)
4. 1/2”-13 Flange Locknut (3)
Installing the Cutting Deck
1. Position the cutting deck under the carrier frame.
2. Mount the cutting deck to the carrier frame with
the two (2) support rods and hairpin cotters
(Fig. 4).
Note: Both support rods must be in the same
hole locations to prevent uneven
cutting.
9
11
2
4
6
1
5
7

10
8
3
Figure 4
1. 1” or 2” (25 or 51 mm)
Height-of-Cut (HOC)
2. 1-1/2” or 2-1/2” (38 or 64
mm) HOC
3. 2” or 3” (51 or 76 mm)
HOC
4. 2-1/2” or 3-1/2” (64 or 89
mm) HOC
5. 3” or 4” (76 or 102 mm)
HOC
6. 3-1/2” or 4-1/2” (89 or 114
mm) HOC
7. 4” or 5” (102 or 127 mm)
HOC
8. Cutting Deck
9. Hairpin Cotter
10. Carrier Frame
11. Support Rod