Service Manual

LINKAGE
4-37Floating Deck Mid-Size Service Manual
4
Operator Presence Control Lever
Installation
1. Install the Operator Presence Control (OPC) rod,
spring tab end rst, through the left side of the
control panel and install the right end of the rod into
the opening on the right side handle bar. Sliding the
rod further through the right side handle bar opening,
install the left end of the rod through the left handle
bar opening (Fig. 0432).
3. Plug the wire harness into the PTO switch (Fig.
0434).
Fig 0432 PICT-0736
Fig 0434 PICT-0728
4. Install the extension spring onto the OPC rod and
the tab on the underside of the control panel (Fig.
0435).
2. Install the PTO switch into the control panel (Fig.
0433).
Fig 0435 PICT-0727
Fig 0433 PICT-0729a