Service Manual

LINKAGE
4-66 Floating Deck Mid-Size Service Manual
4
Handle Assembly Replacement
(T-Bar)
Handle Assembly Removal (T-Bar)
20. Adjust the Speed Control Linkage. Refer to “Speed
Control Linkage Adjustment” on page 4-121.
21. Initially adjust the Neutral Stud. Refer to “Temporary
Neutral Stud Adjustment” on page 4-122.
22. Adjust the left and right hydro control linkages. Refer
to “Hydro Control Linkage Adjustment” on page
4-123.
23. Adjust the Neutral Stud. Refer to “Neutral Stud
Adjustment” on page 4-126.
24. Check the Control Rod. Refer to “Checking the
Control Rod” on page 4-128.
25. Adjust the tracking. Refer to “Tracking Adjustment”
on page 4-129.
1. Turn the engine off and remove the key from the
ignition.
2. Disconnect the negative battery terminal from the
battery.
19. Apply grease to the side ange bearing (Fig. 0547).
Fig 0547 PICT-1021
Fig 0548 g. 7 G004812