Installation Instructions

Figure6
1.Blankingplates3.10-socketconnector
2.4rdright-most-switch
opening(auxiliary-control
panel)
4.Switch(rotation)
6.Pullthe4thrightmost10-socketconnectorsofthe
wiringharnessofthemachinethroughtheswitch
openingswheretheblankingplugswerelocated(Figure
6)
7.Connectthe4thrightmost10-socketconnectorofthe
wiringharnesstothe10pinconnectoroftherotation
switch(Figure6).
8.Rotatetheswitchessothatthelargenotchinthebody
oftheswitchesareforward,andsnaptheswitches
intotheswitchopeningsintheauxiliary-controlpanel
(Figure7).
Figure7
1.Smallnotch
3.Forward
2.Largenotch
9.Securethecoverplatetothebulkheadwiththe6
hex-headbolts(12x30mm)thatyouremovedinstep
1.
2
PreparingtoInstallthe
VibratoryPlow
NoPartsRequired
Procedure
1.Movethetractionunittoalevelsurfaceandlowerall
attachments.
2.Stoptheengine,settheparkingbrake,andremovethe
keyfromtheignitionswitch.
3.Cleantheangeandtherearmountingplateofthe
tractionunit.
4.Ifyouareremovingthetrencherinordertoinstallthe
vibratoryplow,cleanandcapthehydraulicttingsat
thetractionunitandthetrencher.
5.Securetheliftingequipmenttothetowerassembly
(Figure8).
Important:Ensurethattheliftingequipmenthas
aliftingcapacityofatleast794kg(1750lb).
Figure8
6.Raisethetowerassemblyofftheoorasshownin
Figure8.
8