Operator's Manual

6.Install2hex-headbolts(3/4x2-1/2inch),washers,
andnutsintotheverticalholesinthemountingplate
andtheboom-mounttting(Figure35).
7.Install2hex-headbolts(3/4x2-1/2inch),washers,
andnutsintothehorizontalholesinthemounting
plateandtheboom-mounttting(Figure35).
Note:Ensurethatthemountingplateontheboomis
ushwiththeboom-mountttingonthetrencher.
Figure35
1.Nut(3/4inch)4.Boom-mounttting
(trencher)
2.Washer(3/4inch)5.Mountingplate(rock
boom)
3.Hex-headbolts(3/4x
2-1/2inch)
8.Torquetheboltsandnutsto203N-m(150lb-ft).
9.Removetheliftingequipment.
12
AligningtheBoom
Partsneededforthisprocedure:
1Boom
4
Hex-headbolt(3/4x2-1/2inch)
4
Washer(3/4inch)
4
Locknut(3/4inch)
2
Hex-headbolt(1x2-1/2inch)
4
Washer(1inch)
2
Locknut(1inch)
3
Shim
Procedure
1.Checkthealignmentoftheboomandrecordyour
measurementsintheAlignmentWorksheetbelow:
Left-offsetboom:iftheboomisalignedtothe
leftofthesprocketcenterline,placeastraight
edgeacrosstherightfaceofthedrivesprocket
andmeasurethegap(dimensionA)betweenthe
straightedgeandtheendroller(Figure36and
Figure37).
Right-offsetboom:iftheboomisalignedtothe
rightofthesprocketcenterline,placeastraight
edgeacrosstheleftfaceofthedrivesprocket
andmeasurethegap(dimensionA)betweenthe
straightedgeandtheendroller(Figure36and
Figure37).
Nooffset:theboomisaligned(Figure37).
Note:Ifthemeasureddimension-Agapis0to4.8
mm(0to0.1875inch),skiptostep7.
AlignmentWorksheet
YourMeasurement
(dimensionA)
Maximum-offsetgap4.8mm(0.1875inch)
Shim-correctiondimension
19