Operator's Manual
Setup
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
ProcedureDescription
Qty.
Use
1
Nopartsrequired
–
Preparetoinstallthetrencher.
2
Speed-shiftswitch
1
Installthespeed-shiftswitch.
Trencherattachment1
Bolt(1x5-1/2inch)
5
Flatwasher(1inch)
7
3
Locknut(1inch)
6
Installthetrencher.
45°elbowtting(3/4inch)
1
90°anged-elbowtting(1inch)
2
O-ring
2
Flangeclamp4
Hex-headbolt(12x45mm)
8
4
Lockwasher(12mm)
8
Preparethehydraulicmotor.
5
45°elbowtting(3/8inch)
2
Connecttheliftcylinderhoses.
Hose(34-1/2inch)
1
Hose(40-1/2inch)
1
Hose(47inch)
1
6
Cabletie
1
Installthehydraulichoses.
7
Cabletie
1
Connectthewireharnesstothe
hydraulicmotor.
8
Nopartsrequired
–
Purgeairfromthehydraulicmotorand
liftcylinder.
Sprocketsegment
2
Bolt(9/16x2-3/4inch)
8
9
Locknut(9/16inch)
8
Installthesprocket.
Leftauger
1
Rightauger1
Augershaft
1
Augersprocket1
Bearing2
Key(1/2x5inch)
1
Hex-headbolt(3/4x4inch)
2
Locknut(3/4inch)
2
Hex-headbolt(5/8x2-1/2inch)
4
10
Locknut(5/8inch)
4
Installtheauger.
11
Nopartsrequired
–
Installtheboom.
5