Operator's Manual

InstallingtheHandRail
Securethehandrailtothewalkwaywith2bolts(M12x40
mm)and2locknuts(M12)asshowninFigure10.
Figure10
1.Bolts(M12x40mm)3.Locknuts(M12)
2.Handrail4.Walkway
5
ConnectingtheControlstothe
WiringHarness
Partsneededforthisprocedure:
1E-stopswitch
1
Operator-presenceswitch
Procedure
1.Removethe4bolts,4washers,and4nutsthatsecure
thecontrolscovertotheoperatorpedestalofthe
backhoe,thenremovethecover(Figure11).
Figure11
1.Operatorpedestal4.Bolt(4)
2.Controlscover5.Nut(4)—notshown
3.Washer(4)
2.Routethebackhoewiringharnessalongtheleft
hydraulictubealongtheoperatorplatform.
3.Routetheharnessupundertheconsoleasshownin
Figure12.
Figure12
Frontview
1.Backhoewiringharness
4.Routethebranchoftheharnesswitha2-socket
connectorthroughtheseat-posttube(Figure13).
11