Operator's Manual

Drill-spindle-controlSwitch
Whenthisswitchisconnectedtothefrontdrill-pendant
receptacle,moveittocontrolthemovementofthedrill
spindle.
Movetheswitchforwardtorotatethedrillspindle
backwardtowardthepipeholder.
Movetheswitchbackwardtorotatethedrillspindle
forwardtowardtheoperator.
Pipe-grip-controlSwitch
Whenthisswitchisconnectedtothefrontdrill-pendant
receptacle,moveittocontrolthepipegrip.
Movetheswitchforwardtotightenthegriponthepipe.
Movetheswitchbackwardtoloosenthegriponthepipe.
Pipe-clamp-controlSwitch
Whenthisswitchisconnectedtothefrontdrill-pendant
receptacle,moveittocontrolthepipeclamp.
Movetheswitchforwardtotightentheclamponthepipe.
Movetheswitchbackwardtoloosentheclamponthe
pipe.
Cam-rotation-controlSwitch
Whenthisswitchisconnectedtothefrontdrill-pendant
receptacle,moveittocontrolthemovementofthecam.
Movetheswitchforwardtorotatethecambackward
towardthepipeholder.
Movetheswitchbackwardtorotatethecamforward
towardtheoperator.
Pipe-elevator-controlSwitch
Whenthisswitchisconnectedtothefrontdrill-pendant
receptacle,moveittocontrolthepipeelevator.
Movetheswitchforwardtoraisethepipeelevator.
Movetheswitchbackwardtolowerthepipeelevator.
StationaryPipe-clamp-controlSwitch
Whenthisswitchisconnectedtothefrontdrill-pendant
receptacle,moveittocontrolthestationary-pipeclamp.
Movethisswitchforwardtotightenthestationary-pipe
clamp(forlowerwrench).
Movethisswitchbackwardtoloosenthestationary-pipe
clamp(forlowerwrench).
Stake-downLevers
g021835
1
2
3 4
Figure49
1.Left-stake-raise/lower
lever
3.Right-stake-raise/lower
lever
2.Left-stake-spinlever
4.Right-stake-spinlever
Stake-raise/lowerLevers
Pushdownontheseleverstolowerthestakesintotheground.
Pullupontheseleverstoraisethestakesoutoftheground.
Note:TheDrive/Drillswitchontheoperatorpanelmustbe
switchedtotheDrivepositionforthisfunctiontowork.
Stake-spinLevers
Pushdownontheseleverstospinthestakesclockwise.Pull
upontheseleverstospinthestakescounterclockwise.
Note:TheDrive/Drillswitchontheoperatorpanelmustbe
switchedtotheDrivepositionforthisfunctiontowork.
45