Operator's Manual

14 se c t i O n 4 — as s e M b l y & in s t a l l a t i O n
Open Hood by pushing in on the rear, right-side tab with your 7.
right hand, as seen in 1 of Fig. 4-18, and lifting the cover
with your left hand in the center rear of the bagger cover, 2.
Install both bag assemblies with the tight mesh sides facing 8.
forward, onto the bag support brackets by inserting the
front edge in first, as seen in Fig. 4-19, and setting the back
edge down until it fits into the assembly.
Install the rubber chute strap on the chute elbow using the 9.
supplied clevis pin, washer and Bow-tie cotter pin. See Fig.
4-20.
Install the ball pin from your hardware pack into the hole in 10.
the front of the mower deck as seen in Fig. 4-21, and secure
with the supplied flange lock nut.
With the tractor’s discharge chute raised up and held open, 11.
install the chute elbow over the chute opening by placing
the top, rear edge of the chute elbow over the rear of the
deck opening, then pivoting the chute elbow down and
over the chute opening. See Fig. 4-22.
1
2
1
2
Figure 4-18
Figure 4-19
Figure 4-20
Figure 4-22
Figure 4-21