Installation Instructions

Figure104
Machineswiththespraywandkitorelectrichose-reelkit
1.90°elbow(withpressure
port)
3.Pressuresensetube
2.Tubeconnector
20
CompletingtheInstallation
oftheAragtoKZValve
ConversionKit
NoPartsRequired
Procedure
1.Connectthepositive(red)cabletothepositive(+)
batterypostandthenegative(black)cabletothe
negative(–)batterypostusingtheboltsandnuts;refer
toFigure4inDisconnectingtheBattery(page6).
2.Slidetheinsulatorbootoverbothbatteryposts;refer
toFigure4inDisconnectingtheBattery(page6).
3.Movetheproprodfortheseatintotheslotandtiltthe
seatdownuntilitlatchessecurely.
ProductOverview
Controls
Regulating(Rate-Control)Valve
Thisvalve,locatedbehindthetank(Figure105),controls
theamountofuidthatisroutedtotheboomsortherate
returntothetank.
Figure105
1.Regulating(rate-control)
valve
4.Flowmeter
2.Agitationvalve5.Boom-sectionvalves
3.Master-boomvalve
Master-BoomValve
Themaster-boomvalve(Figure105)isusedtostoptheow
totheowmeterandboomvalves.
Boom-SectionValves
Thesectionvalvescontrolowtothe3boomsectionsand
theycanbeturnedonoroff(Figure106).
49