Installation Instructions

Installation
1
InstallingtheBaggerFrame
Partsneededforthisprocedure:
1
Baggerframeassembly(60inchdeck)
Procedure
ThisBaggerFinishingKitcontainsanewBaggerFrame
Assemblywhichisusedforunitswith60inchdecks
only.TheBaggerKitcomeswithaBaggerFrame
Assemblythatshouldbediscardedandreplacedwith
theoneincludedwiththisBaggerFinishingKit.
RefertotheBaggerKitinstallationinstructionsforthe
proceduretoinstallthebaggerframeassembly.
2
InstallingtheBlades
Partsneededforthisprocedure:
3
Hi-Liftblade
Procedure
1.Removetheexistingmowerbladesinstalledonyour
deck.RefertotheRemovingtheBladessectionin
theOperator’sManualformoreinformation.
2.InstalltheHi-Liftmowerbladeslocatedinloose
parts.RefertotheInstallingtheBladessectioninthe
Operator’sManualformoreinformation.
3
InstallingtheChute
Partsneededforthisprocedure:
1
Angledcutoffbafe
1
Curvedbafe
2
Locknut(5/16inch)
1Handknob
1Washer
1
Chute
Procedure
WARNING
Anuncovereddischargeopeningcouldallowthe
lawnmowertothrowobjectsintheoperatoror
bystander’sdirectionandresultinseriousinjury.
Also,contactwiththebladecouldoccur.
Neveroperatethelawnmowerunlessyouinstall
acoverplate,amulchplate,oragrasschuteand
catcher.
Neveroperatethemowerwiththedischargeopening
uncovered.Adischargecover,mulchcoverorbagging
chutemustalwaysbeusedwhenthemowerdeckis
operated.
1.Removefastenerssecuringthedeectorassemblyto
thedeck(
Figure1).Retainallfasteners.
2