Operator's Manual

Setup
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
ProcedureDescription
Qty.
Use
1
Nopartsrequired
Removetheaeratorfromthecrating.
Hitchpin2
2
Lynchpin2
Connectthelowerlinkarms(hitchpins
andlynchpinsareshippedinstalledon
theSR54andSR54-Saerators).
Hydraulictoplink1
Hydraulichose(3-1/2ft)
1
Hydraulichose(2-1/2ft)
1
Extensionbracket2
Rotationalbracket1
3
Hosequickcouplings2
Connectthehydraulictoplink(Models
SR54,SR70,andSR72).
Depthgauge1
Slideblock
1
Machinescrew(#10x1/2inch)
2
Screw(1/4x2-1/2inch)
2
Tubeclamp1
Weldplate1
4
Depthdecal1
Installthedepthgauge.
Spring-loadedtoplink
1
Linkpin3
5
Lynchpin3
Connecttheupperlink(ModelsSR54-S
andSR70-S).
6
Nopartsrequired
Verifythetoplinksetup.
7
Nopartsrequired
CheckthePTOangle.
8
PTOshaft
1
FitthePTOshaft.
9
PTOshield
1
InstallthePTOshield.
Pin(suppliedwithPTOshaft)
1
10
Nut(suppliedwithPTOshaft)
1
ConnectthePTOshaft.
11
Nopartsrequired
Adjusttheswaylinks.
12
Level(notsupplied)
1Leveltheaeratorside-to-side.
13
Tines(asrequired)
Installthetines.
14
Nopartsrequired
Setthetinedepth.
Rearguard1
Screw(3/8x3-1/4inch)
4
Flatwasher(0.438x1inch)
12
Locknut4
15
Endcap2
Installtherearguard.
6