Operator's Manual

MediaandAdditionalParts
Description
Qty.
Use
Operator'sManual
1
Readbeforeoperatingtheaerator
PartsCatalog
1
Usetoreferencepartnumbers
SpringWires-SR48
4Replacementspringwires
SpringWires-SR48
2Replacementspringwires
SpringWires-SR54&SR54-S
6Replacementspringwires
SpringWires-SR70&SR70-S
8Replacementspringwires
SpringWires-SR72
4Replacementspringwires
SpringWires-SR72
2Replacementspringwires
SpringWires-SR75
4Replacementspringwires
SpringWires-SR75
2Replacementspringwires
Operatortrainingmaterials
1
Viewbeforeoperatingtheaerator
PTOOperatorsManual
1
Readbeforeoperatingtheaerator
1
RemovingtheAeratorfrom
theCrating
NoPartsRequired
Procedure
1.Removetheaeratorfromthecrating.
2.Removetheboltssecuringtheaeratorstoragestands
totheshippingpalletandremovetheaeratorfrom
thepallet.
3.Removethestoragestandsfromtheaerator.Retain
themforstorageuse.
Note:TheSR54-SandtheSR70-Sdonothave
shippingstands.
4.Placetheaeratoronaat,levelsurfacewiththe
frontrolleronthegroundanda2x4positioned
undertheheads.
2
ConnectingtheLowerLink
Arms
Partsneededforthisprocedure:
2Hitchpin
2Lynchpin
Procedure
1.Backthetractorsquarelyuptotheaeratoruntil
thelowerlinkarmsarealignedwiththemounting
brackets.
Note:Theaeratorgearboxshaftshouldbeinline
withthetractorPTOshaft(centeredonthetractor).
Iftheyarenotinline,adjustthelowerlinkarms,
fromsidetosideuntiltheshaftsarealigned.
2.MakesurethePTOisdisengaged.
3.Engagetheparkingbrake,STOPtheengineand
removethekeyfromtheignition.Waitforthe
engineandallmovingpartstoSTOPbeforeleaving
theOperator'sseatonthetractor.
Note:Formaximumgroundclearance,thehitch
pinsshouldbesecuredintheaeratorlowermounting
bracketholes,whensoequipped.Todetermine
9