Operator's Manual

G024288
2
1
3
Figure41
SR75
1.Springmountingpost3.Spring
2.Bolt
TransportOperation
Tobegintransportoperation,raisetheaeratoranddisengage
thePTO.Toavoidlossofcontrol,traversesteepinclines
slowly,approachroughareasatreducedspeedandcross
severeundulationscarefully.
Important:Donotexceedtransportspeedsof24
km/hr.(15m.p.h.).
InspectionandCleanupafter
Use
Afterdailyuse,thoroughlywashthemachinewithagarden
hosewithoutanozzlesocontaminationandsealandbearing
damageduetoexcessivewaterpressurewillbeavoided.A
brushmaybeusedtoremovecaked-onmaterial.Usemild
detergenttocleanthecovers.Aftercleaning,greasealldrive
linesandrollerbearings,inspectformachinedamage,oil
leakage,componentandtinewear.DonotoiltheO-ring
drivechain.
Remove,cleanandoilthetines.Sprayalightoilmiston
coringheadbearings(crank&damperlinks).
Cleanandcoatthespringswithadrylubricantlikegraphite
orsilicone.
29