Service Manual

ProCore SR SeriesPage 3 -- 12Chassis
PTO Driveshaft Cross and Bearing Service
1. Remove PTO driveshaft from aerator (see PTO Dri-
veshaft Removal in this section).
2. If necessary, separate PTO driveshaft and remove
shields.
IMPORTANT: When placing yoke in vise, clamp
lightly o n the solid part of the yoke to prevent yoke
damage. Also, the use of a vise with soft jaws is rec-
ommended.
3. Lightly clamp yoke in vise with soft jaws . Remove
snap rings that secure bearings in each yoke. Remove
yoke from vise.
IMPORTANT: To prevent damage to driveshaft
yokes, support yokes when removing and installing
bearings.
4. Use a press to remove cross and bearings from
yokes:
A. Place a small socket against one bearing and a
large socket against the yoke on the opposite side.
B. While supporting the large socket, apply pres-
sure on small socket to partially push the opposite
bearing into the large socket.
C. Remove yoke from press, grasp partially re-
moved bearing and tap on yoke to completely re-
move the bearing.
D. Repeat process for remaining bearings.
E. Thoroughly clean and inspect all components.
5. To install new cross and bearings:
A. Apply a coating of grease to bearing bores of end
yoke and shaft yoke. Also, apply grease to bearings
and seal of bearing assembly. Make sure that all
bearing rollers are properly seated in bearing cage.
B. Press one bearing partially into yoke.
IMPORTANT: Take care when installing cross
into bearing to avoid damaging bearing seal.
C. Carefully insert cross into bearing and yoke.
D. Hold cross in alignment and press bearing in until
it hits the yoke.
E. Carefully place second bearing into yoke bore
and onto cross shaft. Press bearing into yoke.
F. Install snap rings to secure bearings in place.
G. Repeat procedure for other yoke.
H. Grease cross until grease comes out of all four (4)
bearing cups.
6. Make sure that assembled joint moves without bind-
ing. Slight binding can usually be eliminated by lightly
rapping the yoke lugs with a soft faced hammer. If bind-
ing continues, disassemble joint to identify source of
binding.
7. If driveshaft was separated for cross and bearing
service, install shields and assemble driveshaft halves.
8. Install PTO driveshaft to aerator (see PTO Driveshaft
Installation in this section).
1. End yoke
2. Cross and bearing kit
3. Snap ring (4 used)
4. Shaft yoke
Figure 14
3
1
4
2