Operator's Manual
Operation
Note:Theproceduresinthissectionshowa
machinewithaplasticcargobedandbucketseat;
foradditionalproceduresforotherattachments,
refertotheOperationsection(ifapplicable)inthe
InstallationInstructions.Visitwww.Toro.comforyour
instructionsorscantheQRcode(ifapplicable)on
yourattachment.
Note:Determinetheleftandrightsidesofthe
machinefromthenormaloperatingposition.
BeforeOperation
BeforeOperationSafety
GeneralSafety
•Neverallowchildrenorpeoplewhoarenottrained
orphysicallycapabletosafelyoperateorservice
themachine.Localregulationsmayrestrictthe
ageoftheoperator.Theownerisresponsiblefor
trainingalloperatorsandmechanics.
•Becomefamiliarwiththesafeoperationofthe
equipment,operatorcontrols,andsafetysigns.
•Shutoffthemachine,removethekey,andwait
forallmovementtostopbeforeyouleavethe
operator’sposition.Allowthemachinetocool
beforeadjusting,servicing,cleaning,orstoringit.
•Knowhowtostopandshutoffthemachinequickly.
•Ensurethattherearenotmoreoccupants(youand
yourpassenger(s))thanthenumberofhandholds
equippedonthemachine.
•Checkthatallsafetydevicesanddecalsarein
place.Repairorreplaceallsafetydevicesand
replaceallillegibleormissingdecals.Donot
operatethemachineunlesstheyarepresentand
functioningproperly.
PerformingDaily
Maintenance
ServiceInterval:Beforeeachuseordaily
Beforestartingthemachineeachday,performthe
EachUse/DailyprocedureslistedinMaintenance
(page24).
CheckingtheTirePressure
ServiceInterval:Beforeeachuseordaily
Frontandreartiresairpressurespecication:165
to207kPa(24to30psi)
Important:Donotexceedthemaximumair
pressureindicatedonthesidewallofthetire.
Note:Theairpressureneededinthetiresis
determinedbythepayloadthatyouintendtocarry.
1.Checktheairpressureinthetires.
•Uselowerairpressureinthetiresforlighter
payloads,forlesssoilcompaction,fora
smootherride,andtominimizetiremarkson
theground.
•Usehigherairpressureinthetiresfor
carryingheavierpayloadsathigherspeeds.
2.Ifnecessary,adjusttheairpressureinthetires
byaddingorremovingairinthetires.
g001055
Figure9
14