Service Manual

Workman HD Series Page 6 − 67 Drive Train
8. Install PTO intermediate shaft sub−assembly:
A. If removed during disassembly, insert bearing
into PTO housing.
B. Put gear on mating gear.
C. Move gear until bores of gear and bearing line up.
D. Insert intermediate shaft sub−assembly. Apply
grease to intermediate shaft to aid assembly.
3
3. Bearing
Figure 140
1
2
1. Intermediate shaft
sub−assembly
2. Gear
Figure 141
9. Insert PTO shaft assembly into bearing housing of
PTO housing.
1
1. PTO shaft assembly
Figure 142
Drive Train