Service Manual

SAE Straight Thread ORing Port Nonadjustable
(Fig. 4)
1. Make sure both threads and sealing surfaces are free
of burrs, nicks, scratches, or any foreign material.
2. Always replace the Oring seal when this type of fit-
ting shows signs of leakage.
3. Lubricate the Oring with a light coating of oil.
4. Install the fitting into the port and tighten it down full
length until finger tight.
5. Tighten the fitting to the correct flats from finger tight
Figure 4
(F
.F.F.T.).
Size F.F.F.T.
4 (1/4 in. nominal hose or tubing) 1.00 + .25
6 (3/8 in.) 1.50 +
.25
8 (1/2 in.) 1.50 + .25
10 (5/8 in.) 1.50 + .25
12 (3/4 in.) 1.50 + .25
16 (1 in.) 1.50 + .25
SAE Straight Thread ORing Port Adjustable
(Fig. 5, 6)
1. Make sure both threads and sealing surfaces are free
of burrs, nicks, scratches, or any foreign material.
2. Always replace the Oring seal when this type of fit-
ting shows signs of leakage.
3. Lubricate the Oring with a light coating of oil.
Lock Nut
O–Ring
Backup Washer
4. Turn back the jam nut as far as possible. Make sure
the back up washer is not loose and is pushed up as far
as possible (Step 1).
Figure 5
5. Install the fitting into the port and tighten finger tight
until the washer contacts the face of the port (Step 2).
6. To put the fitting in the desired position, unscrew it by
t
he required amount, but no more than one full turn (Step
Step 1
3).
7. Hold the fitting in the desired position with a wrench
and turn the jam nut with another wrench to the correct
flats from finger tight (F
.F.F.T.) (Step 4)
Step 2
Size F.F.F.T.
4 (1/4 in. nominal hose or tubing) 1.00 + .25
6 (3/8 in.) 1.50 +
25
8 (1/2 in.) 1.50 + .25
10 (5/8 in.) 1.50 + .25
12 (3/4 in.) 1.50 + .25
Figure 6
16 (1 in.) 1.50 + .25
Step 4
Step 3
O–Ring
Hydraulic System Page 9 4 Workman 3000/4000 Series