Operator's Manual

Setup
1
InstallingtheFrontRoller
NoPartsRequired
Procedure
Thedethatchingunitisshippedwithoutafrontroller.Install
therollerusingtheloosepartssuppliedwiththedethatching
unitandinstallationinstructionsincludedwiththeroller.
2
RepositioningtheCounter
Weights
NoPartsRequired
Procedure
Thedethatchingunitsareshippedwiththecounterweight
mountedtotherightendandthemotormounttotheleftend
ofthedethatchingunit.Tomovethecounterweighttothe
othersideofthedethatchingunit,dothefollowingsteps:
1.Removethe2capscrewsthatsecurethecounterweight
totherightendofthedethatchingunit.
2.Removethecounterweight(Figure3).
Figure3
1.Counterweight
3.Removethe2Allen-headscrewsthatsecurethemotor
mounttotheleftendofthedethatchingunit.
4.Removethemotormount(Figure4).
5.Applygreasetotheinsidediameterofthedrivespline
(Figure4).
Figure4
1.Drivespline3.Allen-headscrew
2.Motormount
6.Ontherightendofthedethatchingunit,applyalight
coatingofoiltotheO-ringandinstallthemotormount
withthe2Allen-headscrewspreviouslyremoved.
Note:Torquethescrewsto16to20N-m(12to15
ft-lb).
7.Ontheleftendofthedethatchingunit,applyalight
coatingofoiltotheO-ringandinstallthecounter
weightwiththescrewspreviouslyremoved.
Note:Torquethescrewsto16to20N-m(12to15
ft-lb).
3
InstallingtheHoopLink,Offset
Link,orChainLink
NoPartsRequired
Procedure
Fordethatchingunitsthatwillbemountedonatractionunit
withaserialnumberpriorto240000001,theproperliftlink
mustbeobtainedandinstalled.
Note:The2capscrewsusedtomounttheliftlinkcome
installedonthedethatchingunit.
5