Service Manual
InstallingtheReelAssembly(continued)
6.Installtherearroller;refertoInstallingtheRearRoller(page7–28).
7.Installthefrontroller;refertoInstallingtheFrontRoller(page7–27).
8.Installthebedbarassembly;refertoInstallingtheBedbar(page7–12).
9.Tightenthereelnuts:
A.Insertalong-handledprybar(3/8x12inchwithascrewdriverhandle
recommended)throughthefrontofthecuttingunit.Theprybarshould
passbetweenthetopofthereelshaftandthebacksofthereelbladesso
thatthereelwillnotmove.
IMPORTANT
Toavoidgrindingthereel,donotcontactthecuttingedgeof
anybladewiththeprybarasthismaydamagethecuttingedge
and/orcauseahighblade.
g286354
Figure120
1.Reelnut(rightendshown)3.Weldsideofreelsupportplate
2.Reelshaft
4.Prybar
B.Movetheprybaragainsttheweldsideofthereelsupportplateclosestto
thereelnutbeingtightened.
IMPORTANT
Thereelnutontheleftendofthecuttingreelhasablacknish
andhasleft-handthreads.Thereelnutontherightendofthe
cuttingreelhasasilvernishandhasright-handthreads.
C.Restthehandleoftheprybaragainstthefrontrollerandtightenthe
reelnutclosesttotheprybar.Tightenthereelnutfrom123to149N·m
(90to110ft-lb).
DPACuttingUnits:ServiceandRepairs
Page7–24
Greensmaster3120
17230SLRevD