Service Manual

Table Of Contents
TestProcedure(continued)
CAUTION
Beforeopeninghydraulicsystem,operateallhydrauliccontrolsto
relievesystempressureandavoidinjuryfrompressurizedhydraulic
uid;refertoReleasingPressurefromtheHydraulicSystem(page
6–8).
3.Gainaccesstohydraulicliftcontrolmanifoldfrombelowfrontofmachine.
g230045
Figure102
1.Frontaxle
2.Liftcontrolmanifold3.Testport(G4)
4.Cleantestport(G4)onthebottomofliftcontrolmanifold(Figure102).
Accesstotestportcanbeobtainedfrombelowthefrontofthemachine.
Connecta35,000kPa(5,000psi)pressuregaugetotestport.
5.Afterinstallingpressuregaugetomanifoldtestport,startengine,andrun
atidlespeed.Checkforanyhydraulicleakagefromtestconnectionsand
correctbeforeproceedingwithtest.
6.Ensurethatthehydraulicuidisatnormaloperatingtemperatureby
operatingthemachineunderloadforapproximately10minutes.
7.Ensurethattheengineisrunningathighidlespeed.
IMPORTANT
Donotallowpressuretoexceed17,500kPa(2,500psi).
Reelmaster
®
5410/5510/5610Series
Page6–87
HydraulicSystem:TestingtheHydraulicSystem
15216SLRevE