Service Manual
Reelmaster 5010 SeriesPage 4 - 70
4. Carefully lower pump assembly to machine frame.
5. Secure pump assembly to machine frame with two
(2) flange screws and flange nuts.
6. Secure pump support bracket to inside of frame
bracket with two (2) carriage screws (item 38) and
flange nuts (item 36).
7. Install hydraulic hoses t o fittings on pump assembly
in positions noted during removal.
8. Connect machine harness electrical connector to
traction neutral switch.
9. Position traction control cable to traction pump lever
and secure plate (item 10) to pump lever with cap screw
and lock nut. Secure cable bracket to traction pump with
two (2) flange head screws.
10.Install hydraulic pump drive shaft (see Hydraulic
Pump Drive Shaft Installation in this section).
11. Check oil level in hydraulic reservoir and add correct
oil if necessary.
12.Follow Hydraulic System Start- up procedures (see
Hydraulic System Start- up in this section).
13.Check traction drive for neutral and traction neutral
switch operation. Adjust if necessary.
Hydraulic System