Service Manual

Table Of Contents
ReliefValve(R1)and(R2)PressureTest(Cutting(Mow)Circuit)
(5410/5410-G/5410-D/5510/5510-G/5510-D/5610)
g230023
Figure93
Thereliefvalve(R1)and(R2)pressuretestshouldbeperformedtoensurethat
thecuttingunitcircuitreliefpressuresarecorrect.
Note:Thefrontcuttingunitcircuitisprotectedbyreliefvalve(R2).Therear
cuttingunitcircuitisprotectedbyreliefvalve(R1);refertoHydraulicFlow
Diagrams(5410/5410-D/5510/5510-D/5610)(page6–20).
TestProcedure
1.Ensurethatthehydraulicuidisatnormaloperatingtemperatureby
operatingthemachineunderloadforapproximately10minutes.
HydraulicSystem:TestingtheHydraulicSystem
Page6–74
Reelmaster
®
5410/5510/5610Series
15216SLRevE