Operator's Manual
7
InstallingtheRollBar
Partsneededforthisprocedure:
1Rollbarassembly
4Flangeheadbolts
4Locknuts
1Hoseclamp
Procedure
Important:Neverweldormodifyarollover
protectionsystem(ROPS).Replaceadamaged
ROPS,donotrepairorrevise.Anyalterationofa
ROPSmustbeapprovedbythemanufacturer.
1.Lowertherollbarontothetractionunitmounting
brackets,aligningthemountingholes.Ensurethat
theventtubeontherollbarisontheleftsideof
themachine(Figure9).
Figure9
1.ROPS
4.Fuellineventtubehose
2.Mountingbracket5.Hoseclamp
3.Venttube
2.Secureeachsideoftherollbartothemounting
bracketswith2angeheadboltsandlocknuts
(Figure9).Torquethefastenersto60ft-lb(81N-m).
3.Securethefuellineventhosetotheventtubeonthe
rollbarwiththehoseclamp.
Youmustconnectthefuellineventhosetothe
venttubepriortostartingtheengineorfuelwill
owfromthehose.
8
InstallingtheFrontLiftArms
Partsneededforthisprocedure:
2
Liftarms
2Pivotrod
2
Bolt(5/16x7/8inch)
Procedure
1.Removethe2boltsthatsecuretheliftarmpivot
shaftlinktotheliftarmpivotshafts,andremove
andretainthepivotshaftlinkandbolts(Figure10).
Figure10
1.Liftarm,pivotshaftlink2.Liftarmpivotshaft
2.Insertapivotrodintoeachliftarmandalignthe
mountingholes(Figure11).
Figure11
1.Liftarm
2.Pivotrod
3.Securethepivotrodstotheliftarmswith2bolts
(5/16x7/8inch).
17